Nice Grid, storage for integrating renewable Strength and islanding, a proven actuality Solenbat optimises the active Electricity efficiency of buildings Stem, Electricity storage methods for minimized electricity billing Paradise, a smart network to the local people Innovation Shut

Cable harness The cable harness is an easy strategy for powering ATyS A transfer switch units. It is supplied with voltage faucet offs and supplies a trustworthy backlink in between the controller and changeover switch for:

รับสมัครช่างวายริ่งตู้คอนโทรล,ช่างไฟฟ้า,ช่างประกอบตู้คอนโทรล รับทำตู้ไฟชั่วคราว ตู้ไฟสนาม ตู้มิเตอร์

Rapidly commissioning On Original electricity up, the ATyS C65’s good wizard will manual the operator throughout the commissioning procedure.

Chance to established periodic genset startup Possibility to set periodic genset startup ATyS p switches give added capabilities for maintenance. They include things like a programmable genset beginning purpose which permits the starting dates and running periods for being configured.

Effortless Config Method software program Configure your Socomec measuring and cargo breaking products Program method for a quicker, a lot more trusted plus more adaptable configuration of your respective ability checking method

Protected ATyS p M have both of those electrical and mechanical interlocks for the best possible stability. In addition they element a beneficial crack indicator, confirming change placement with dual mechanical indicators for elevated safety.

ATyS t and g switches supply major time conserving throughout commissioning (method can take two to 3 minutes). Owing to the design that permits commissioning by way of just two potentiometers (four on the ATyS g) and four DIP switches, a scrrewdriver is everything is needed to configure the parameters.

Remote control interface Exclusively made for installations exactly where the item is enclosed, the distant interface shows solution status on the entrance panel (D10) or displays and controls with access to programming (D20).

Additional sturdy The up to date style and design incorporates steel mounting legs throughout the whole ATyS variety, enhancing the general robustness with the switches. What's more, it ATS AISIKAI makes it possible for A simpler and difficulty-no cost mounting with the switches on the back plate with preassembled screws.

Inspectable contacts The ATyS DT is particularly made to lessen the time it will require to inspect electrical power contacts when using the specific routine maintenance method.

Recording of gatherings ATyS p switches help efficient checking of your set up because of timestamped celebration recording.

Intuitive operation - The substantial-resolution Liquid crystal display monitor presents several dashboards enabling simple monitoring of all parameters, including power and energy use of your hundreds.

A lot more strong The up to date structure involves metal mounting legs over the complete ATyS variety, improving upon the overall robustness of the switches. What's more, it enables A better and trouble-totally free mounting of your switches over a back plate with preassembled screws.